[10/07] Sunday morning, before our houseguests arrived... this was our kitchen.

[10/08] As of Monday night, cabinet work on the left side is well underway. Nothing has changed on the right side yet.

[10/09] Tuesday night, the lower cabinets went in on the left side while demolition began on the right side.

[10/10] By Wednesday night, most of the electrical work was done as are the cabinets on the left side. The right side has been cleared now.

[10/11] No more changes to the left side, but not all the cabinets, refrigerator, and dishwasher are in on the right side.

[10/12] Friday night, around 9:30PM, the counter tops were finished and the sink is in place (but not hooked up). And the refrigerator is now producing delicious cold filtered water!

[10/13] Saturday was a mall-shopping day, and then we all went out to dinner. In between though, we managed to finish up the plumbing; the dishwasher and sink are ready for use! The paper towels there are checking for leaks.